Industries / Construction

Construction labour, from the booking to the invoice.

Raise a shift, check the cards, record the hours, run the payroll and send the invoice. It is one system, so nothing is entered twice.

Cards are checked when somebody is booked. If a card has expired, the booking does not go through.

One view of every agency working on your sites.

If you use more than one agency, our system puts all of them in one place — the people, the hours and the spend — so you are not logging into three portals to work out where you stand.

  • See who is on your site today

    You get a live list of everyone booked on, which agency sent them, and what each person holds. If the alarm goes or an auditor turns up, the answer is already on screen rather than something you assemble from four sources.

  • Approve hours against your own cost codes

    Day rate, price work and measured work all reach you in the same place, already coded. Your QS can see what has been signed off against each code while there is still time to query it, instead of after the application has gone in.

  • Get three weeks of warning on AWR

    Our software runs the twelve-week clock for every worker on every site and warns you at week nine. That gives you time to plan for the rate change rather than meeting it on an invoice.

What we check in construction

  • Right to work, checked once

    Checked once and kept against the worker, with the evidence stored behind it. It is reused the next time they are booked.

  • An AWR clock for each site

    The twelve-week clock runs from the first week on a site. You get a warning before the worker qualifies.

  • Rest and hours

    Maximum shift length, rest between shifts and consecutive days are set for the sector and applied when the shift is created.

The schemes, and how each card gets checked

Set up already, with the awarding body and the way each card is checked.

  • Checked against the scheme

    CSCS

    The card most UK construction sites check at the gate. Colour and grade say what the holder is qualified to do.

  • Checked and recorded

    CITB

    Site Safety Plus — the supervisor and manager courses, and the touchstone health, safety and environment test.

  • Checked against the scheme

    NOCN / CPCS

    Plant operators, endorsed by machine category — a 360 excavator ticket is not a telehandler ticket.

  • Checked against the scheme

    CISRS

    Scaffolding, from trainee through to advanced and supervisor.

  • Checked and recorded

    IRATA

    Rope access, at three levels, with a supervisor required on site above a certain size of team.

  • Checked and recorded

    TWI

    Welder qualification and inspection — CSWIP and the coding behind pressure and structural work.

  • Checked against the scheme

    NPORS

    The other plant scheme, used alongside CPCS and accepted on most sites.

  • Checked and recorded

    IPAF

    Powered access — scissor lifts and boom lifts, by category.

  • Checked and recorded

    PASMA

    Mobile access towers.

  • Checked against the scheme

    CCDO

    Demolition, which most principal contractors require in place of a general card. Graded from trainee to manager.

  • Checked automatically

    Home Office right to work

    Not a qualification, which is why it is the one requirement nobody can override. Checked once from a share code and reused.

Roles we set up most often

Requirements attach to the role, so the check runs on every booking. Your own list is set up during onboarding.

General labourer
Right to work, and a CSCS Labourer card.
Groundworker
Right to work, and a skilled-worker CSCS card backed by an NVQ at level 2.
Steel fixer, bricklayer, carpenter
The same skilled-worker route, with the trade endorsement on the card.
Scaffolder
A CISRS card at the level the work needs — trainee, scaffolder or advanced.
Scaffolding supervisor
CISRS at supervisor level, on top of the operative card.
Plant operator
CPCS or NPORS, endorsed for the exact machine — 360 excavator, forward-tipping dumper, telehandler.
MEWP operator
IPAF for the category of platform, plus a card for site access.
Site supervisor
A supervisory CSCS card and the CITB supervisor course.
Site manager
A manager CSCS card and the CITB manager course.
Rope access technician
IRATA at the level the work is rated for.
Welder
Coding for the process and material, and a card for site access.

We will show you this working

We can show you construction running end to end: a shift created, a card checked, a booking refused, hours approved, and the payslip and invoice that follow.

Send us your requirements

Send us the cards and checks your construction sites ask for. We will set them up in Bonim and show you the checks running.